11.63 Increasing Power and Resources Applied to the Critical Path

Every moment, we decide how much of our Energy, at what Rate to apply to various potential paths.

Our mission is to:

  1. Grow the unified pool of Energy available
  2. Accelerate the Rate at which Energy is applied towards the Critical Path or Critical Chain

The Critical Path / Critical Chain is determined based on the Bottleneck to Throughput of The Goal.

Our Power to transform is a function of the amount of Energy we can gather and the Rate at which we can apply it to the Critical Chain.